Automated Drone-Secured Floating Wind Torpedo Pile Mooring Anchor Yard Cap Rate 2026

Underwrite heavy-capacity reinforced industrial outdoor storage (IOS) staging yards for 120-ton dynamic penetrometer torpedo pile anchors ($1,380/stall/mo).

Underwriting Assumptions

Projected Economics

Net Operating Income (NOI)
--
Going-In Capitalization Rate
--
Stabilized Institutional Valuation
--