Automated Drone-Secured Floating Wind Turbine Blade Staging Yard Cap Rate 2026
Underwrite heavy-capacity reinforced industrial outdoor storage (IOS) staging yards for 120-meter offshore wind turbine blades with automated LiDAR drone dimensional stability inspection ($1,240/stall/mo).
Underwriting Assumptions
Projected Economics
Net Operating Income (NOI)
--
Going-In Capitalization Rate
--
Stabilized Institutional Valuation
--